MJ Concrete Construction Pro LLC logo
Foundations8%

Built Strong. Built Right.

Stamped concrete patio with seating wall in a Charlotte, NC backyard
Concrete Service

Concrete Patios

Stamped, broom and decorative backyard patios — across Charlotte, Gastonia and 30 miles around.

(704) 860-7869
Free Estimates
Local Crews
Open 7 Days
Overview

Concrete Patios in Charlotte & Gaston County

A patio is the one slab on your property you actually sit on, so it has to look right and stay flat. MJ Concrete Construction Pro LLC builds new backyard patios, patio extensions, pool decks, walkway-to-patio connections and seating-wall surrounds throughout Charlotte and Gaston County — stamped, broom-finished, exposed aggregate or colored, with the base and reinforcement work that keeps them from settling.

Why patios settle — and how we stop it

Almost every failed patio we are called out to look at failed underneath, not on top. Someone poured four inches of concrete over loose backfill or straight onto scraped clay, and within a couple of seasons one corner dropped, water started pooling against the house, and the joints opened up.

Charlotte's red clay makes this worse than it needs to be. It holds water, swells, then shrinks back in a dry August. We deal with that by removing the unstable material rather than levelling it, compacting the sub-grade, and placing a gravel base in lifts so the slab bears on something that will not move seasonally.

Reinforcement matters too, but only if it is placed correctly. Mesh dragged up mid-pour ends up wherever it lands. We tie steel on chairs so it stays at the right height while the concrete is placed around it.

Stamped, broom or exposed aggregate?

Stamped concrete gives you the look of slate, flagstone, brick or wood plank in one continuous pour — no joints for weeds to grow through and no individual pavers to settle. It is the most popular choice for patios we build, and with a good release colour it reads as natural stone at a fraction of the cost.

A broom finish is the plain-spoken option: durable, non-slip, inexpensive and easy to repair or extend later. Exposed aggregate sits between the two — texture and visual interest from the stone in the mix itself, and it hides dirt and wear well on a heavily used patio.

Around pools and shaded north-facing spaces we will steer you toward a finish with real slip resistance, and away from anything that gets glassy when wet.

Patios that connect to the rest of the property

A patio rarely stands alone. It meets a back door, a set of steps, a walkway around the side of the house, sometimes a driveway or a detached garage. Because we self-perform sidewalks, steps, walls and flatwork, we can pour those elements in the same scope with matching colour, finish and joint layout instead of stitching mismatched slabs together over three summers.

Seating walls, fire-pit pads, grill surrounds and raised planters are all straightforward add-ons when they are planned before the base goes in. Retrofitting them afterward almost always means cutting into concrete you just paid for, so it is worth deciding at estimate time.

Living with a new patio

Stay off a fresh patio for 24 to 48 hours, keep furniture off it for a week, and expect full design strength at 28 days. Sealing comes after that first cure — usually around the one-month mark — and stamped patios benefit from resealing every two to three years to keep the colour from washing out.

Hairline cracking at control joints is expected and by design; that is exactly where we cut the slab so it cracks somewhere you will not notice. Anything wider, out of joint, or accompanied by a change in elevation is not normal, and we would rather you call us and ask.

What's Included

Every concrete patios project covers

  • New patios, extensions and full patio replacements
  • Stamped patterns: ashlar slate, seamless stone, wood plank, brick
  • Integral color, color hardener and antiquing release finishes
  • Broom, smooth-trowel and exposed aggregate options
  • Compacted gravel base sized for Piedmont clay soil
  • Rebar or wire mesh reinforcement set on chairs
  • Slope and drainage detailing away from the house
  • Seating walls, steps, fire-pit pads and grill surrounds
  • Saw-cut control joints laid out to suit the patio shape
  • Sealing guidance and repeat-customer resealing
Our Process

Four steps from first call to final cure

01

Design & Layout

We measure the space, talk through how you actually use it — dining, grilling, hot tub, fire pit — then lay out shape, size and finish so the patio fits the yard instead of fighting it.

02

Excavation & Base

Topsoil and organics come out, the sub-grade is compacted, and a gravel base is placed and compacted in lifts. This is the step that decides whether the patio is still flat in ten years.

03

Forming & Reinforcement

Forms are set to the finished elevation with slope carried away from the house, then rebar or mesh is tied on chairs so the steel sits inside the slab rather than under it.

04

Pour, Stamp & Cure

Concrete is placed and floated, color and pattern are worked while the slab is in the right window, joints are cut, and the patio is cured and sealed before we hand it back to you.

Why It Matters

What a careful job actually buys you

Concrete is the cheapest part of a concrete job. The base, the steel, the drainage and the cure are what decide how long it lasts.

Built to Last

Correct thickness, compacted base and real reinforcement — the three things that decide whether concrete lasts 30 years or 6.

Water Managed

Correct fall on every slab and drainage behind every wall, so stormwater leaves instead of working into the concrete.

Code Compliant

Built to pass inspection first time — right depth, right steel, right cover, documented and ready when the inspector arrives.

Cured Properly

Protected against Carolina heat and cold so the concrete actually reaches the strength you paid for.

Our Standard

Five habits we do not skip

Premium results come from disciplined habits, not shortcuts. This is the standard we hold on every pour, no matter the size.

Straight Answers

Itemised scope, honest timelines, and a clear no if a repair beats a replacement.

Base Done Right

Excavated to depth, soft spots removed, crushed stone compacted in lifts — not dumped and levelled.

Steel on Chairs

Rebar set at the specified height with correct cover and lap lengths. Never hooked up mid-pour.

Joints On Schedule

Control joints at correct spacing, cut within the first day before shrinkage finds its own path.

Walkthrough & Care Plan

A final walkthrough plus written guidance on when to drive on it and when to seal it.

FAQ

Concrete Patios questions, answered

Ready When You Are

Get a free estimate for concrete patios

Share a few details about your project and MJ Concrete will come back with clear next steps — no pressure, no obligation.

(704) 860-7869